Structural works

The frame before covering

Yaoundé area

The frame before covering

What this site shows

Columns, lintels and the façade arch cast, the roof frame set on the walls. The building has its final shape before the first sheet goes on: this is when slopes, overhangs and ceiling heights get checked, while a correction still costs little.

WhereYaoundé area
TradeStructural works
Views2
What the views showOn site

This site in pictures

The frame before covering 1
The frame before covering 2

Your project

A plot, an idea, a budget?

Describe your project in five answers. You get a reply the same day, and a costed quote as soon as the project is precise enough.

Contact+237 682 510 263